Perfect Facility & Utilities
UTILITIES AND WASTE TREATMENT SYSTEM For the benefits of its clients, Nava Nakorn has provided the international standard infrastructure and public utilities including: |
| |
|
 |
ELECTRICITY SUPPLY A 115 KV transmission line connecting with a substation of The Provincial Electricity Authority and 22 KV line to each industrial site have the total power capacity approximately 285 MVA |
 |
Natural Gas By PTT Natural Gas |
 |
WATER SUPPLY By The Provincial Waterworks Authority |
 |
WASTE WATER TREATMENT SYSTEM "Aerated Lagoon" as the modern waste water treatment facilities which have the capacity to treat waste approximately 26,000 cu.m./day have been installed as requiring by government regulation. |
 |
FLOOD PREVENTATION SYSTEM Bund around the area which is 2.5 M. above road level, V-Ditch drainage , and 3 large drainage stations assist in the flood preventation of the project. |
 |
TELEPHONES TOT Corporation Public Company Limited and Telecom Asia Co., Ltd. have installed over 5,000 telephone lines in the area which has been installed immediately as requiring. Moreover , there are High Speed Leased Line for Internet, Frame Relay, Video Conference,and Mobile Phone Relay Base for digital system 1800/GSM and analog system in the project. |
 |
ROADS Roads leading to the project area, as well as roads within the complex, are paved and ample width. The main roads are reinforced concrete road which have 4 lanes and 40 meters wide and the secondary roads are 30 meters-wide reinforced concrete road. |
 |
SECURITY SYSTEM Nava Nakorn has managed the security system at all project area, including Police Station and Fire station. It is for the security and being in perfect order traffic.
|
 |
Solid Waste Disposal Hazardous & Non Hazardous from the production process are taking care by the professional companies such as Genco, Better World Green, etc. |
|